CANA Construction A CANA Group Company
  • About Us
  • Safety
  • Services
    • Our Services
    • Pre-Construction Services
    • Delivery Methods
    • Own Forces
    • Sustainable Construction
    • Technology
  • Projects
  • Careers
    • A Career with CANA Construction
    • Why Choose CANA?
    • Current Job Opportunities
  • Giving Back
  • Contact Us
    • Contact Us
    • Subtrade Opportunities

Our
Projects

Husky Place – Lloydminster Office

Lloydminster, Saskatchewan

CANA was the General Contractor and Project Manager for Husky Energy on their Lloydminster office project. This facility is nearly twice the size of Husky’s past existing office in the area but has the same energy consumption, speaking to the efficiency of the building.

The 100,000 ft2 office houses nearly 400 employees over four floors of the building. The main entrance, grand lobby and three-storey atrium are on the first floor of the facility. The three story atrium features a “floating” staircase visible to a passerby of the building. The top three floors contain open concept office spaces, which are primarily cubicles.

The office features a fully equipped fitness area, a multimedia training room, boardrooms and meeting rooms with the most advanced technologies, a fully equipped lunchroom and cafeteria, an assembly space, and an interpretive centre.

Owner
Husky Oil Operations Ltd.
Square Footage
100,000
Completion
2012
Project Type
Office
Architect
Gibbs Gage
  • Home
  • About Us
  • Safety
  • Services
  • Projects
  • Careers
  • Giving Back
  • Contact Us

The CANA Group of Companies

  • CANA Construction
  • CANA Utilities
  • CANA High Voltage
  • Shepard Development

Follow Us

  • LinkedIn
  • Twitter
2019 © Copyright CANA Group of Companies. All rights reserved.